The Arborloo
Book
How to make a simple pit toilet
and grow trees
or make humus for the garden.

Written by Peter Morgan
Introduction
Most of the rural population of Africa do not have
access to safe and reliable toilets. A good toilet, together with a safe
reliable water supply and the practice of good personal hygiene can do much to
improve personal and family health and wellbeing.
So there is an urgent need for the construction
of simple, low cost, affordable toilets that are easy
to build and maintain and are relatively free of odours and flies.
This booklet describes how to make a toilet which is
both low cost and easy to make. Builders and artisans are not required, once
the householder has learned the basic methods of construction.
To start all that is required is part of a bag of
cement (between one eighth (5 litres) and one quarter (10 litres) of a 50 kg
bag), and some good river sand and thick wire. With this the householder can
build a concrete slab which will last for many years. The slab is mounted on a
“ring beam” of bricks or concrete and a shallow pit is dug down inside the
beam. A simple structure for privacy, made from locally available materials, is
then built around the slab.
Flies and odours are controlled by regularly adding
soil, wood ash and leaves into the shallow pit. By adding the soil, ash and
leaves, the excreta in the pit turns into compost. It is possible to grow a
tree on this compost, which will later form fruit or supply timber for fuel or
building. It is also possible to dig out the compost after a suitable time and
use this to fertilise the vegetable garden. So the simple toilet can have many valuable
uses!
This particular toilet is called an Arborloo because a
tree is planted on the filled pit. The Arborloo is then moved to a new place.
Over the years it is possible to improve on the
original toilet using the same concrete slab. It is a small amount to pay for
something that gives so much benefit to the family.
The Arborloo is the name given to a simple
pit toilet.
It is easy to construct & is cheap to
build.
The Arborloo is made up from 4 parts:
1. The pit
2. The “ring beam” to protect the pit
3. The concrete slab which sits on the ring
beam
4. The toilet house which surrounds the slab.
The Arborloo pit fills up with a mix
of excreta,
soil, wood ash and leaves.
Leaves are put
in the base of the pit before use and every day some soil and wood ash are
added to the pit.
Dry leaves are
also added to the pit.
No garbage is
put down the Arborloo pit
When soil, ash
and leaves are added to excreta, it changes quite fast into compost. The daily
addition of soil and ash also helps to control flies and smells.
When the Arborloo pit is full, the toilet is
moved
to another place
and a thick layer of soil and leaves is placed over the pit contents
A young tree is
planted in this soil and is watered and cared for and also protected against
animals
The toilet is
used again in the same way in the new Arborloo
site. The same process takes place again.
After some years
trees will be growing where the toilet was before. A new orchard of fruit trees
or a woodlot of gum trees will be growing, using the compost formed from the
excreta. In this way our excreta is recycled!.
HOW TO BUILD THE ARBORLOO
1. How to make the concrete slab
The concrete
slab is made with a mixture of cement and good quality river sand with some
wire reinforcing.
The mould for
the concrete slab is made from a ring of
bricks laid on
levelled ground. The bricks are laid around
a circle marked
on the ground, one metre in diameter (radius 50cm).

A sheet of
plastic is laid in the mould

The squat hole
is made by placing a shaped plastic bucket
or shaped bricks
in the slab mould.
A mixture of
fresh cement and very good river sand is now made up.
The mixture is 5 litres of fresh cement and 30 litres
clean river sand.
If the cement is
not fresh or the river sand is not clean it is best to make a stronger mix of
10 litres of cement and 30 litres of river sand.
This is mixed thoroughly
in a wheel barrow before adding water.

The sand and
cement must be very well mixed. After mixing the dry sand and cement add water (about
2 - 3 litres) to make a stiff mix.
Mix thoroughly again. Add half the mix to the
slab mould and spread out evenly

Add 4 reinforcing
wires each 3 to 4mm in diameter and 90cm long
in a square shape
around the squat hole. Then add the rest of the concrete mixture. Spread out
evenly. Also ram down hard with a wooden float. Smooth off with a steel trowel.
Add two thick wire handles on either side for lifting.
After 3 hours
take out the bricks (or bucket) from the squat hole and make the edges neat with
a trowel

Cover the slab with
a plastic sheet overnight.
The following morning
- wet down the slab and cover again.
The slab must be
kept covered and wet for 10 days
before moving
2. How to make the ring beam
The ring beam
helps to keep the top of the pit from falling in. It supports the concrete slab
and soil taken from the pit is rammed in place around it to make the toilet safer.
The ring beam
can be made of bricks and anthill mortar or it can be made from concrete made
with a mix of cement and clean river sand.
It is important
to raise the toilet base above ground level.
The ring beam is
made on slightly raised ground where the
toilet is to be built.
2a. How to make the brick ring beam
Get some fired
farm bricks and mark a circle on the ground 80cm in diameter (radius 40cm). Lay
the bricks around the circle.
.
Now make up some
ant hill mortar (Ivhu re pa churi) by breaking
up ant hill soil
and mixing with water.
Using a trowel
add the anthill mortar between and above the bricks.
Then add a
second layer of bricks on the first layer. The upper layer of bricks should sit
on the joint between bricks of the first course. Use the anthill mortar to hold
all the bricks together.

Then dig out the
pit inside the ring beam down to 1 metre or
even 1.5 metres
below ground level. Some of the soil which comes out of the pit is placed
around the ring beam and rammed hard in place. This will help to make the ring
beam strong in its place.

This ring beam
and soil helps to raise the toilet above ground level and stops rain getting
into the pit. The ring beam and surrounding
soil helps to make
the toilet stronger.
2b. How to make a concrete ring beam
If bricks are
not available, but we have good river sand and fresh cement we can make a
concrete ring beam to place the slab on.
The same mixture
for making the concrete slab is used to make the concrete ring beam. That is 5 litres of cement and 30 litres of river
sand.
But the cement
must be fresh and the river sand very clean. The measurements and the mixes
must be exact and 10 days curing for
the cement is required. If the cement is not fresh or the river sand is not
clean it is best to make a stronger mix of 10 litres of cement and 30 litres of
river sand.
Level off some
ground and lay a plastic sheet over the ground. Take some bricks and make two
circles of bricks. The concrete ring beam will be made in between the two
circles of bricks. Lay the bricks so the outer and inner circles will make a
ring beam in between them which is 85cm
inside and 115cm outside. Thus the
width of the ring beam is 15cm all
round. Fill the spaces opened up between inner bricks with wet sand.

Once the brick
mould has been made, make up the concrete mixture of 5 litres fresh cement with
30 litres good river sand. Mix the dry
parts thoroughly first then mix with about 3 litres fresh water. Mix thoroughly
again. .Add half of this mixture to the mould. Then take a length of 3 – 4mm
wire and place above the concrete mix about half way between the inner and
outer bricks. Then add the remainder of the concrete mix to the mould and level
off with a wooden float. Ram hard down with the wooden float. Steel handles can
also be added if required. Finish off with a steel trowel.
Cover with
plastic sheet and leave overnight. The following morning, wet the ring beam and
keep wet and covered for10 days. After 10 days the ring beam can be lifted and
put into place. Dig down the pit inside the ring beam to 1m or more and place
soil around the ring beam.
Stages in making and locating the concrete ring beam

Fill in spaces
between inner circle of brick mould with wet sand. Make the 6:1 mix of clean
river sand and fresh cement. Add half the mix, level off and then add the circle of 3 – 4mm wire

Add remainder of concrete mix, level off and ram flat with
wooden float. Cover with plastic sheet and leave to cure for 10 days. Keep wet
at all times. Then move to location on level ground.

Dig down hole within the ring beam to at least 1 metre
below surface. Place soil around ring beam and ram in place hard. Add leaves to
pit base. Lay anthill mortar or weak cement on ring beam and place slab on top.
Bed in and level the slab. The structure can now be built around the slab.
Putting the slab and brick ring beam together
Once the slab has
had time to cure (10 days) and become strong it can be moved into the place
where the toilet will be built.


First put a big
sack full of dry leaves in the pit
The leaves will
help the contents of the pit to compost.
Then lay the
slab over the ring beam
It is best to
lay the slab in some mortar placed on the ring beam.
This can be made
of anthill mortar or weak cement and sands (20:1).
Building the toilet house (superstructure)
We now build the
house over the ring beam and slab with local materials like poles and grass.

This house structure
is used to make the place private. There are many ways of making the house
structure. It is best to make a roof to fit over the structure for shade and to
keep the rain out.
HOW TO USE THE ARBORLOO
When using the Arborloo we add dry soil, wood ash and
leaves
to the pit as well as our excreta. This mix
of excreta, soil, ash and leaves helps to make good compost in the pit.
Add soil and ash
after every visit to deposit faeces, about a small cup full of soil and some
ash, but not after every visit to add urine. Sometimes add extra leaves.
Keep the toilet
clean
Do not put
rubbish down the pit like plastic and rags
Use the toilet
until the pit is nearly full.
When the pit is nearly full it is time to move the
Arborloo to a new place.
We take away the
house or take it apart.
We remove the
concrete slab and ring beam. If it is a brick ring beam
We take the
bricks apart and re-use them in the new site.
We cover the contents
of the pit with leaves and
a thick layer (150mm
deep) of good soil.
We now rebuild the
brick ring beam in a new place.
If we are using
the concrete ring beam it just needs to be moved
We dig a new pit
inside the ring beam and surround the
ring beam with
soil and ram hard.
We add a sack of
leaves to the bottom of the pit
We place the
slab on the new ring beam and build the house as before
Then we can then
start to use the new toilet.
For the old pit
We have covered the
pit contents with leaves and plenty of soil
We can leave
this pit to settle and wait for the rains
before planting
a new young tree
OR
We can plant a
young tree in the soil and look after it. It will
require
protection from animals and frequent watering
Planting trees

The first trainees at Kufunda planting a mulberry tree
on an Arborloo pit
Good trees for
this Arborloo pit are mulberry,
guava, mango, paw paw and banana. But we can plant many other trees
Plant the young
tree in the soil above the compost. The young trees must be cared for. They
must be protected from animals and must be watered often. In time the tree will
grow big and provide many fruits.
Once the tree is
established we can fertilise the tree with a mix of urine (2 litres) mixed with
water (10 litres) and a mug full of
wood ash every
month to help it grow more.
The Arborloo
will move about in the
garden and will
help to make many new trees. It can be used to make a new orchard of fruit trees or a wood
lot of gum trees. It can also be used to make shade or ornamental trees.
The time to fill
the Arborloo pit depends on the depth of the pit and the number of users. It
will be between 6 and 12 months
Larger slabs and ring beams can be made for the
Arborloo. The slabs can be 1.2 metres in diameter and fit over larger ring
beams constructed over pits 1 metre in diameter. Then the pit will take longer
to fill up. Larger slabs and ring beams cost more to make because they use more
cement. Also if the sand is poor, or the cement is not fresh a stronger mix of
sand and cement must be used (like 3:1, 4:1 or 5:1).
Making compost
If we wish to
make compost in the pit for use on the vegetable garden, we can use the same small
slab and ring beam. But we need to make another two
ring beams and put in place so there are a total of 3 ring beams (with pits) in
our garden.
The slab and
toilet house will move from the pit 1 to pit 2 and then to pit 3, as the pits
fill up with the mix of excreta, soil, ash and leaves. When pit 3 is full we
empty pit 1 of the compost (after 12 months or more of composting). This
compost is fertile and can be mixed with garden soil and used to grow
vegetables. Mix one part compost with two parts topsoil. Also add leaf compost
or garden compost if available. The slab and the house can then be put back on
the pit 1 which has been emptied.
So we can rotate
the slab and toilet between the three pits in the garden. The ring beams stay
in place permanently
This way we can
“harvest” the good compost from each pit every year, and use it to grow better
vegetables. It is important that the pit be left for one full year to compost
before being dug out. So with our toilet we can grow trees or we can make good
compost for the garden.
UPGRADING
The system which
has been described is designed to be simple and low cost. The slabs and ring
beams are small and are mounted over pits which have a small capacity (about
0.5 cu.m.). This is ideal for the Arborloo
concept, and even with three small composting pits used on a rotation basis, a
never ending source of compost can be made. The ring beam concept works well on
a great range of soils, but obviously it will not work in very loose sandy
soils. Ring beams of this type must be used with light weight toilet houses,
like poles and grass or other light materials. It is very unwise to build a
brick house around a pit lined with a ring beam only. The weight of the bricks
may lead to pit collapse. Pits should be fully lined with bricks if a brick
structure is used. This method however will be unsuitable for the Arborloo which is moved often from one
location to the other.
However once a
strong 1 metre diameter slab and matching concrete ring beam have been made, it
is possible to use these same components on larger or even brick lined pits in
the future.
It is possible,
for instance, to cast a larger ring beam with an internal diameter of 1 metre
and an outer diameter of 1.3 metres using a mix of 6 litres of cement and 35litres
clean river sand. When the pit is dug down to one metre inside this larger ring
beam the pit size in increased by about 1.5 times, compared to the 0.85m
diameter pit. If the pit is dug down to 1.3 metres, the capacity of the pit is
nearly doubled.
To use the
smaller slab, which has already been made, the smaller ring beam can be placed
on the larger ring beam and then the small slab placed on top. In the same way
bricks ring beams can be stepped in (corbelled) so that the diameter of the
lower courses is greater than the upper courses. This method is used a lot in
Malawi.
When pits are
dug with greater capacity they take longer to fill, and thus the movement of
the slab and toilet house needs to take place less often. This may be seen as
an advantage to many families. Pits can be dug deeper as well as wider to
increase capacity. The conversion of excreta to compost will still take place
if generous amounts of soil, wood ash and leaves are placed down the pit
together with excreta.
ALTERNATING BETWEEN TWO PITS
If the pits are
wider in diameter (one metre) and dug deeper (1.2 – 1.5 metres), a family will
take a year or more to fill the pit, even when soil, ash and leaves are added.
In this case it is possible to make two permanently sited pits and alternate between
them at yearly intervals.
Fertile compost
can be dug out and used on the garden once a year. This is a system called the Fossa alterna.
A pit 1 metre in
diameter and 1.3 metres deep has a capacity of just over one cubic metre, about
twice the a capacity of an Arborloo
pit 0.8m in diameter and one metre deep. This capacity is ideal for the use of
the Fossa alterna. The effect is the
same as the system described earlier with three smaller pits used in rotation.
With the Fossa alterna, it is only necessary to
dig two pits, each of one cubic metre capacity, and these two can be used
alternately for many years on one site. Once a year the compost is dug out of
one pit and the slab and toilet house placed back on the emptied pit. In some
cases the two pits can be dug and enclosed inside a single permanent toilet
house. This method is popular in Malawi and Mozambique.
Once again,
plenty of dried leaves are added to the base of the pit before use. Dry soil
and wood ash are added to the pit daily and leaves quite often. This mixture together
with excreta composts well.
The compost dug
out of the pit can be mixed with top soils to increase its fertility and humus
content. When mixed with poor sandy soils in equal proportions the compost can
increase vegetable growth considerably.
Using the systems described here it is
possible to start off in a very low cost and simple way and over the years
upgrade the system to suit the needs of each family.

A very neat Arborloo structure and citrus trees
growing in Malawi
The writer gratefully acknowledges the help and
support of Marianne Knuth, Annie Kanyemba and Kufunda Village staff in the
production of this booklet.